The New PIT Terminal by the Numbers

Local tax dollars spent: Zero.
Pgh Mag Drone Screen Grabs 7

AN AERIAL VIEW OF THE NEW TERMINAL, SHOWING THE THREE LEVELS: TOP IS FOR DEPARTURE DROP-OFFS, MIDDLE IS FOR ARRIVAL PICKUPS AND BOTTOM IS FOR MASS TRANSIT, TAXIS AND VANS. | PHOTO COURTESY OF THE PITTSBURGH INTERNATIONAL AIRPORT

$1.7 Billion

Cost of the new terminal

0

Local tax dollars spent

33 Years

Age of old landside terminal

811,000 sq ft

Size of new terminal

8,800 acres

Size of airport property

9.95 million

Number of passengers in 2024

55

Number of gates

62

Number of nonstop destinations (including London, Reykjavik, Toronto, Montreal & Cancun)

4

Number of runways

12

Number of public TSA security lanes (up from 6 at the old main checkpoint)

3 miles

Length of baggage track (down from 8 at the old landside terminal)

22,000

Number of parking spaces (up from 16,000)

4

Number of outdoor terraces

160 ft

Length of “new” bridge and tunnel inside the new terminal

14,000

Number of direct and indirect jobs created

Looking for more information about the airport? Read our user’s guide to the new terminal at Pittsburgh International Airport. 

Categories: The 412, Travel